Sunday 6 April 2014

Implementation project Activities for SAP BI/BW


  1. Part of BW upgrade project from 3.1 to 7.3.
  2. Regression testing of all the BW extractor,error handling and bug fixes.
  3. Reconciliation of all the BW reports with R3 data.
  4. Requirement Analysis and preparing High Level Design (HLD) document, User Requirement Specification (URS) document,Effort Estimation.
  5. Conducting Client sessions for Requirement Gathering and recommending BW Reporting level changes
  6. Understanding the current landscape and advising Client on how they can consolidate all their existing Reports from different IT systems into SAP BI Reporting
  7. Recommending BW data flows in order to replace existing non-SAP applications across the entire IT landscape and integrating it into a single uniform system
  8. Handling High priority tickets, CRs and other deliverables
  9. Participated in Knowledge Transfer sessions before the shadow support and prepared the play back session ppts given to the client. 
  10. Debugging highly complex ABAP routines.
  11. Responsible for Data load scheduling(Daily/weekly/monthly) as well as load monitoring,process chain optimization.
  12. Analysed the reasons for frequent load failures and fixing the errors and make sure that data is available for reporting.
  13. Providing support for BW related activities in R/3 system.
  14. Interacting with the customer in getting requirements and providing value addition solutions if required.
  15. Preparing and participating weekly and Monthly Status meeting with the customer.
  16. Participation and providing inputs in the Pre and Post planning round meetings.
  17. Monitoring regular process chain and sending status to the user.
  18. Have given Knowledge Transfer on system landscape and data flow from different interfaces present in the system to the new joiners to the project.
  19. Creating DSO,Cubes & Open Hub's.
  20. Documentation related to Logistics
  21. Testing routines.
  22. Creating Process chains. 
  23. Loading and monitoring data in Production system.
  24. Checking and Monitoring Performance of Queries.
  25. Go-live Cut over activities

No comments:

Post a Comment